IT for office moves and new fit-outs
The furniture is the easy part of moving offices. The internet connection that takes weeks to install, the cabling that has to go in before the ceiling closes and the network that must work at nine on Monday are where moves go wrong. We plan the IT side from the first floor plan to day one.

Office moves & fit-outs for small and medium businesses
Office moves tend to surprise people in the same few ways. Fibre for the new building is ordered a fortnight before the move and turns out to need a new lead-in from the street. The fit-out builder runs data cables to the wrong desks, or not at all to the meeting rooms. The comms cupboard has no ventilation. And on Monday morning nobody can print because the copier still points at the old network.
We get involved early, ideally when you are still choosing a building. We check what internet services are available at the address, tell you how long they take and order them as soon as the lease is signed. We mark up the floor plan with data points, Wi-Fi access points, screens and the comms cupboard, and give the builder and electrician a clear specification to work to, before any walls go up.
Then we run the move itself. Equipment is labelled and shut down cleanly, the network is built and tested at the new site before staff arrive, and on the first morning a technician is there walking the floor, checking every desk, printer and meeting room. The whole project is quoted in writing first. A week later we check in again to tidy loose ends, update your network documentation with the new layout and make sure the old premises have been fully cleared of equipment and data.
What's included
Building check
Before you sign, we check internet availability, existing cabling, the comms cupboard and phone and mobile coverage at the new address.
Internet ordering
Fibre and a backup connection ordered early, with lead times tracked and chased so the line is live before move day.
Cabling and Wi-Fi design
Data points, access point positions and the comms cabinet marked on the floor plan, with a written specification for the cabling installer.
Builder and electrician coordination
We work with your fit-out team so data cabling, power for equipment and ceiling access happen in the right order.
Network build
Firewall, switches and Wi-Fi installed and tested at the new site before any staff arrive.
Move weekend
Computers, servers, printers and screens labelled, packed, moved and reconnected, with each one checked against the plan.
Day-one support
A technician on site the first morning, checking every desk, meeting room, printer and phone and fixing problems as they appear.
Old site clear-out
Equipment removed from the old office, data wiped from anything left behind and internet services cancelled on the right date.
Who is office move planning for?
Bring us in early if:
- You are choosing between buildings and want to know the internet options
- A fit-out is starting and the builder needs a cabling plan
- Your move date is fixed and the internet hasn't been ordered yet
- You are expanding into a second floor or another tenancy
- You want staff working normally on the first morning in the new office
Not sure where to start?
Our free IT health check looks at your devices, accounts, backups, security and network. You get a short written report with what is working, what is at risk and a price to fix it. No obligation.
Book the health checkOffice moves & fit-outs questions
How early should we involve you?
As early as possible, and at least two to three months before the move. Business fibre can take several weeks, longer where a new connection to the building is needed, and cabling has to be planned before walls and ceilings are closed.
Do you install the cabling?
We design the network cabling and Wi-Fi, specify it and manage the installer, or do smaller low-voltage cabling jobs ourselves. Power outlets and any mains wiring are done by a registered electrician.
How much does an office move cost?
It depends on the number of staff, the state of the new building and how much equipment is moving. After a site visit we send a written quote that lists each stage, so there are no surprises.
Can we keep working during the move?
Most moves are done over a weekend or after hours. Email, Teams and cloud files keep working throughout, and the new office network is ready before staff arrive.
What if the internet isn't ready in time?
We plan a fallback, usually a temporary wireless or mobile broadband connection, so the office can open even if the fibre install slips.
Should we buy new equipment for the move?
A move is a good time to replace ageing switches, Wi-Fi or a tired server, because the work is happening anyway. We'll tell you what is worth moving and what isn't.
Do you help with a fit-out in a building we already occupy?
Yes. Refits, extra floors and reconfigured desks follow the same process, scheduled around your working hours.
Other ways we help

Managed IT
One monthly price per person for support, security, updates and backups. Your outsourced IT team.
Managed IT
IT support
Remote and onsite help when you need it, billed by the hour. No plan, no contract.
IT support
Cyber security
Practical protection against scams, ransomware and account takeover, set up and kept current.
Cyber security